WM Fabria WM Fabria™
How it works

From drawing to certified weld, in three steps.

The same record follows the joint from the drawing register to the QA pack you hand over — nothing is re-keyed on the way.

Rolled isometric drawings and a fanned stack of mill test certificates on a fabrication office desk. 01

Import your drawings & certs

Bring in the drawing register, isometrics, MTRs, and WPS. WM Fabria reads the weld list and seeds the planned welds — re-import is a sync, never a duplicate.

A gloved hand holding a rugged tablet beside a flanged stainless steel pipe spool on the shop floor. 02

Record welds as they happen

Welders, dates, heats, and NDT go on the weld log — on a desktop in the office or a tablet on the floor. Status updates the moment a weld is signed off.

A freshly printed stack of QA records in a printer tray, with an inspection stamp and a rolled drawing. 03

Generate the QA pack

Weld registers, traceability sheets, welder cards, and NDT summaries — co-branded PDFs, generated on demand and ready for the client or the auditor.

Bring your weld log into the system of record.

Sign in with your work account and start with your own data — import a drawing register and watch the weld log build itself.